由甲方申請更換變壓器
2.一樓生產(chǎn)用電電纜線由此房引出至生產(chǎn)車間設(shè)備所在位置。
3.新砌100厚輕質(zhì)砌塊墻體,水泥粉刷,面刷白色涂料。
4.水泥修補(bǔ)地面,高差處放坡,坡度不大于2%
5.一樓拆除破損舊門,新?lián)Q木門,數(shù)量15扇
6.增加消防疏散標(biāo)識(shí)
1. Application by the Party to replace the transformer
2. The first floor of the production of electricity from the room leads to the cable to the production workshop equipment location.
3. New puzzle 100 thick light wall block, cement paint, surface paint white paint.
4. Cement repair the ground, the height difference at the slope, slope is not greater than 2%
5. the first floor of the demolition of the old door, the new wooden doors, the number of 15
6. Increase the fire evacuation identification